In accordance with consumption tax law, 10% consumption tax shall be imposed separately on the rate stated in the list.
Classification | Mooring Hours | Rate(Unit:Yen) | |
---|---|---|---|
Per GT | Berths for large vessels (over 6 meters in depth) |
less than 2h | 6.1 |
2 -12h | 9.15 | ||
over 12 - 24h | 12.2 | ||
over 24h | *For moorage of more than 24h, \6.10/GT is additionally charged for every 12h. | ||
Berths for small vessels (less than 6 meters in depth) (including Landing Stage : less than -4.5 meters in depth) |
less than 2h | 4.8 | |
2 -12h | 5.85 | ||
over 12 - 24h | 6.9 | ||
over 24h | *For moorage of more than 24h, \3.45/GT is additionally charged for every 12h. |
Discount for international liners
a) Volume-based incentive
- 30% of the charge is discounted on vessels of over 10,000GT but less than 30,000GT.
- For vessels of over 30,000GT, 50% of the charge on tonnage exceeding 30,000GT is discounted .
Discount for Cruise Ships
a) All 20%off
b) Arrival/Departure at Hakata Port 50% off
c) Even if the mooring time exceeds 12hrs, the fee will stay the same as for 12hrs.
Classification | Mooring Hours | Rate(Unit:Yen) |
---|---|---|
Per GT | less than 2h | 6.1 |
2 -12h | 9.15 | |
over 12 - 24h | 12.2 | |
over 24h | *For moorage of more than 24h, \6.10/GT is additionally charged for every 12h. |
Classification | Rate (Unit:Yen) |
---|---|
Per moorage | 3,200 |
Classification | Gross Tonnage | Rate (Unit:Yen) |
---|---|---|
For each 24h moorage | Vessels of less than 1,000GT | 5,000 |
Vessels from 1,000 to less than 3,000GT | 10,000 | |
Vessels from 3,000 to less than 5,000GT | 14,900 | |
Vessels from 5,000 to less than 10,000GT | 22,300 | |
Vessels from 10,000 to less than 15,000GT | 37,200 | |
Vessels of 15,000GT and over | 44,600 |
Classification | Rate(Unit:Yen) |
---|---|
Per bus/day | 2,000 |
Classification | Storage Period | Rate(Unit:Yen) |
---|---|---|
Per m2/day (General Use) |
1-15 days No foreign trade cargo is charged for the first three days. |
7.1 |
16 - 30 days | 15.3 | |
31 days and over | 38 | |
Per m2/month (Special Use) |
- | 200 |
Classification | Rate(Unit:Yen) |
---|---|
Per m2/month (Special Use) | 615 |
Classification | Rate(Unit:Yen) |
---|---|
Per month (Special Use) | 8,069,000 |
Classification | Rate(Unit:Yen) |
---|---|
Per month (Special Use) | 2,200,000 |
Classification | Rate(Unit:Yen) |
---|---|
Per month (Special Use) | 2,100,000 |
Classification | Rate(Unit:Yen) |
---|---|
Per month (Special Use) | 1,987,000 |
Classification | Period | Rate(Unit:Yen) |
---|---|---|
Meeting room | Per hour | 1,700 |
Office | Per m2/month (Special Use) | 1,900 |
Gate Facility | Per month (Special Use) | 300,000 |
Others | Per m2/month (Special Use) | 2,000 |
Classification | Rate(Unit:Yen) |
---|---|
Per inspection per container | 1,000 |
Classification | Rate(Unit:Yen) | ||||
---|---|---|---|---|---|
Per month (Special Use) | 961,400 |
Classification | Period | Rate(Unit:Yen) | |
---|---|---|---|
Per m2/day (General Use) |
Paved area | 1 - 15 days | 5.5 |
16 - 30 days | 11.1 | ||
31 days and over | 22 | ||
Unpaved area | 1 - 15 days | 2.8 | |
16 - 30 days | 5.1 | ||
31 days and over | 10.2 | ||
Per m2/month (Special Use) |
Paved area | - | 127 |
Unpaved area | - | 71 |
Classification | Rate(Unit:Yen) |
---|---|
Per set of 5 equipments per month(Special Use) | 13,600,000 |
Classification | Rate(Unit:Yen) |
---|---|
Per crane/30min | 26,000 |
a)The charge is reduced to 23,000yen/30min on Sunday when vessels that regularly undergo cargo handling activities on Sunday.
b)1,200yen is subtracted from the charge of each transshipment cargo per use.
Classification | Rate(Unit:Yen) |
---|---|
Per plug/hour | 120 |
Classification | Storage Period | Rate(Unit:Yen) | |
---|---|---|---|
Per m2/day (General Use) | Paved Area | 1 - 15 days | 5.5 |
16 - 30 days | 11.1 | ||
31 days and over | 22 | ||
Unpaved Area | 1 - 15 days | 2.8 | |
16 - 30 days | 5.1 | ||
31 days and over | 10.2 | ||
Per m2/month (Special Use) | Paved Area | 127 | |
Unpaved Area | 71 | ||
Mayor-designated Area | 102 |
Classification | Rate (Unit:Yen) |
---|---|
Per month (Special Use) | 11,500,000 |
Classification | Storage Period | Rate (Unit:Yen) |
---|---|---|
Per m2/day (General Use) | 1 - 45 days | 0.7 |
46 days and over | 1.1 | |
Per m2/month (Special Use) | Type 1 | 9 |
Type 2 | 12 |
Classification | Rate (Unit:Yen) | |
---|---|---|
In the case of bad weather or out of office hours, 50% of the charge will be added. | Up to 3t | 2,190 |
Per ton for over 3t | 730 |
Classification | Rate (Unit:Yen) | ||
---|---|---|---|
Cranes | Per crane per month | For boom length of less than 7m | 2,700 |
For boom length of over 7m | 4,000 | ||
Others | Per m2/month | 161 |
Classification | Rate (Unit:Yen) |
---|---|
Per month (Special Use) | 1,800,000 |
Classification | Rate (Unit:Yen) |
---|---|
Per m2/month | 615 |
Classification | Rate (Unit:Yen) | |
---|---|---|
Per m2/month (In the case of installment of utility poles and pipes etc., the regulations of road utilization charges of Fukuoka City shall be applied and the rate shall be calculated accordingly.) | Paved Area | 191 |
Unpaved Area | 118 |
Classification | Rate (Unit:Yen) |
---|---|
Per m2/month | 20 |
Classification | Rate (Unit:Yen) | ||
---|---|---|---|
Per m2/month (In the case of installment of utility poles and pipes etc., the regulations of road utilization charges of Fukuoka City shall be applied and the rate shall be calculated accordingly.) | Site for Sheds and Warehouses | 241 | |
Shed Rooftop | 80 | ||
Other Sites | Paved Area | 214 | |
Unpaved Area | 133 |
Rate |
---|
The regulations of road utilization charges of Fukuoka City shall be applied and the rate shall be calculated accordingly. |
Classification | Rate (Unit:Yen) | |
---|---|---|
Per GT (No vessel of less than 700GT is charged.) | International service | 2.60 |
Domestic service | 1.30 |
Note: 50% of the charge (\1.30/GT) is discounted for international liners.
- LNG (liquefied natural gas) fueled ships, hydrogen-fueled ships (including fuel cell ships), battery-powered ships, ammonia-fueled ships and ships using synthetic fuels (green methane, green methanol): 100% discount
- For vessels using biofuels and synthetic fuels (heavy fuel oil, diesel oil) the rate of port dues discount will be determined according to the fuel mixture ratio.
Classification | Rate (Unit:Yen) |
||
---|---|---|---|
Terminal Charge | Per person on embarkation | 6 -11 years old | 250 |
12 years old and over | 500 | ||
Inspection facility and terminal for international passengers | Per use | 3,500 | |
Boarding Bridge | Per equipment per day | 35,000 | |
Baggage Office | Per hour | 406 | |
Baggage Room | Per room per hour | 6,100 | |
Freight Sorting Yard | Per room per day | 4,200 | |
Per room per hour | 530 | ||
Terminal Hall | (RoomA/B) Per room |
Up to 1h | 20,000 |
over 1 - 3h | 30,000 | ||
over 3 - 5h | 40,000 | ||
Over 5h | 60,000 | ||
Meeting Room | Per room | Up to 1h | 20,000 |
over 1 - 3h | 30,000 | ||
over 3 - 5h | 40,000 | ||
Over 5h | 60,000 | ||
Special Reception Room | Per room | Up to 1h | 5,200 |
over 1 - 3h | 10,400 | ||
over 3 - 5h | 15,600 | ||
Over 5h | 26,000 | ||
Waiting Room | Per room per hour | 320 | |
Car Parking | Per car per use | Every 30 min | 100 |
Over 4.5 - 24h | 1,000 | ||
Over 24h | For use of more than 24h, 1,000yen is charged every 24h and the rate for less than 24h is calculated accordingly as stated above | ||
Office | Per m2/month | In the case of utilization by national or local authorities | 1,750 |
Others | 2,000 | ||
Shop | Per m2/month | Type 1 | 3,000 |
Type 2 | 2,000 | ||
Warehouse | Per m2/month | 2,000 | |
Car Parking for Business Use | Per car/month (Exclusive of buses) | 15,800 | |
Electric Bulletin Board | Per board per month. [In the case of commercial use by those who do not have permission for special use (exclusive of electric bulletin board use only), double rates shall be charged.] | 12,000 |
Note: Double rates shall be charged in case users of the terminal charge admission fee.
Classification | Rate (Unit:Yen) |
|||
---|---|---|---|---|
Observation Deck | Per m2/month | 280 | ||
Per m2/day | 28 | |||
Indoors | In the case of commercial use by those who do not have permission for special use (exclusive of electric bulletin board use only), tenfold rates shall be charged. | Floors | Per m2/month | 2,000 |
Per m2/day | 200 | |||
Walls | Per m2/month | 1,000 | ||
Per m2/day | 100 | |||
Outdoors (Exclusive of observation deck) |
In the case of installment of utility poles and pipes etc., the regulations of road utilization charge of Fukuoka City shall be applied and the rate shall be calculated accordingly. | Per m2/month | 560 | |
Per m2/day | 56 |
Pilotage | Hakata Pilot Association | TEL:092-291-4494 |
---|---|---|
Tuggage | Hakata Port Towage Cooperative | TEL:092-674-4600 |
Line handling | Hakata Port Service Center | TEL:092-641-8831 |